The project includes the reconstruction
of approximately 9,900 square yards of existing concrete apron,
which was constructed in the 1940’s. This portion of the General
Aviation pavement is nearest to the General Aviation terminal and is
most frequented by large jet transport charters and corporate
aircraft. These include regular business charters and charters of
visiting sports teams arriving for NCAA games to the University of
Florida. This pavement is vital to the airport as 32% of Airport
revenue is derived from GA operations.
The pavement to be reconstructed has been found to be in “very poor”
condition per the 2008 Statewide Airfield Pavement Management
Program completed by the FDOT. The project is a full concrete
reconstruction of the area which will result in longer life and less
maintenance. The original concrete has provided more than 60
years of service life. Two design alternatives were
considered, asphalt vs. concrete. Asphalt was chosen due to
budget limitations and the fact that the surrounding pavement, which
makes up the majority of the GA apron, is asphalt of varying
strengths. Refinements to parking orientation, overnight
tie-down locations, traffic patterns and striping are also
included. Please
click here to view the project diagram.
ESTIMATED TOTAL COST
Construction
The following bid schedules were awarded
to Hipp Construction Equipment Co., of Alachua, Florida.
Bid Schedule A
$ 730,818.03
Bid Schedule B
$ 311,526.08
Bid Schedule C
$ 200,415.25
Bid Schedule D1
$ 449,272.09
Bid Schedule E1
$ 259,747.89
Total Construction
$ 1,951,779.34
Please click here to
view the contract award recommendation and bid tab.
Engineering
The following Task Orders have been
awarded to URS Southern Corporation for Design and Construction
phase engineering services.
Task Order #3 Design Phase
Services $ 141,656.00
Task Order #6 Construction Phase Services $
191,000.00
Total Engineering
$ 332,656.00
Administrative
The following total has been added to
project costs to cover preliminary and administrative costs such as
required independent fee estimates, and construction contingency
fees.
Preliminary and
Administrative $ 5,664.66
TOTAL PROJECT COST
$ 2,290,100.00
AMOUNT OF ARRA FUNDS TO BE USED
The project will utilize $2,290,100.00 of American Recovery and